top of page

Wing 1 production completed

And here is the result of the first wing. After the team glued the two wing halves last week inside the molds, we were able to take the result out of mold today. It worked well.

The result is more than amazing. A perfect structure and no errors. The next step is done and the maiden flight is waiting for us.

Empfohlene Einträge
Aktuelle Einträge
Archiv
Schlagwörter
Folgen Sie uns!
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
bottom of page